The US grid is in its biggest build-out in decades. This map tracks 20 of the largest transmission projects across 26 states, from long-distance HVDC lines that move wind and hydropower hundreds of miles to the new 765 kV backbones planned in Texas, the Midwest and Virginia, plus 5 of the biggest new power plants built or planned to feed data centers and industry. Every project links to the developer, regulator or news report its figures come from.

Filter by type of project or status, or search for a developer or state. Click any line or plant for its size, cost and expected in-service date.

Map of 25 major US power grid projects

20 of the largest high-voltage transmission projects and 5 of the largest new power plants, across 26 states. Solid lines are in service; dashed lines are being built, approved or still in permitting. Click a line or plant for the developer, size, status, expected in-service date and source. Updated November 2026.

6,112miles of new high-voltage line
21projects being built, approved or permitted
16.7 GWin the new power plants on the map
$38.2Bpublished cost of projects not yet in service

Lines are drawn straight between the end points (and main stops) the developer has named, to show which regions a line will join. They are not the surveyed route, which for many lines is still being decided.

Every project on the map

Major US transmission lines and power plants with developer, type, states, size, status, cost, in-service date and source
ProjectDeveloperTypeStatesSizeStatusCostIn serviceSource
SunZia Wind
Largest wind farm in the US
Pattern EnergyLarge new power plantsNM3,500 MWIn service–2026Jun 12, 2026
SunZia Transmission
Carries power from the SunZia wind farm in New Mexico to Arizona and California
Pattern EnergyLong-distance HVDC linesNM, AZ550 mi, 525 kV HVDC, 3,000 MWIn service–2026Jun 2026
Champlain Hudson Power Express
Canadian hydropower to New York City (Astoria, Queens)
Transmission Developers and Hydro-QuebecLong-distance HVDC linesNY339 mi, HVDC, underwater and underground, 1,250 MWIn service$6BMay 2026May 13, 2026
New England Clean Energy Connect
Quebec border to Lewiston, Maine
AvangridLong-distance HVDC linesME145 mi, HVDC, 1,200 MWIn service–Jan 2026Jan 16, 2026
Homer City Energy Campus
Gas plant with seven GE Vernova turbines for a data center campus
Homer City Generation (built by Kiewit)Large new power plantsPA4,500 MWUnder construction–2027Jun 2, 2026
Greenlink West
Las Vegas to Fort Churchill near Yerington
NV Energy765 kV and 500 kV AC linesNV472 mi, 525 kV, 4,000 MWUnder construction$4.2BMay 2027Sep 2024
TransWest Express
Wyoming wind to Utah, Nevada and California
TransWest Express LLC (Anschutz)Long-distance HVDC linesWY, CO, UT, NV732 mi, AC and HVDC, 3,000 MWUnder construction–2030 (first stage)Jan 2026
Entergy Louisiana gas plants for Meta Hyperion (first three)
Gas combined cycle: two in Richland Parish, one in St. Charles Parish
Entergy LouisianaLarge new power plantsLA2,300 MWUnder construction––Nov 18, 2026
Orange County Advanced Power Station
Gas combined cycle near Bridge City; more than 80% complete
Entergy TexasLarge new power plantsTX1,200 MWUnder construction––Nov 18, 2026
Boardman to Hemingway
Boardman, Oregon to Melba, Idaho
Idaho Power and PacifiCorp765 kV and 500 kV AC linesOR, ID290 mi, 500 kV, 1,000 MWUnder construction–2027Nov 18, 2026
Grain Belt Express
Phase 1 (Kansas to Missouri) is first to be built
InvenergyLong-distance HVDC linesKS, MO, IL, IN800 mi, 600 kV HVDC, 5,000 MWApproved, not yet built$11B2030Nov 2026
Permian 765 kV line: Glen Rose to Reeves County
Approved by Texas regulators Aug 28, 2026; part of the Permian Basin Reliability Plan
Oncor765 kV and 500 kV AC linesTX400 mi, 765 kVApproved, not yet built––Sep 2, 2026
Permian 765 kV line: San Antonio area to the Permian
Approved by Texas regulators Aug 28, 2026
Texas transmission utilities765 kV and 500 kV AC linesTX765 kVApproved, not yet built––Aug 28, 2026
Phantom to Crossroads to Potter 765 kV
First 765 kV line in the Southwest Power Pool
Xcel Energy765 kV and 500 kV AC linesTX, NM765 kVApproved, not yet built––Feb 2025
Big Stone South to Brookings to Lakefield Junction 765 kV
Part of the MISO Tranche 2.1 765 kV backbone
MISO Tranche 2.1765 kV and 500 kV AC linesSD, MN765 kVApproved, not yet built––Nov 18, 2026
East Adair to Minnesota/Iowa State Line 765 kV (EASL)
Central Iowa north to the Minnesota line, joining the Lakefield Junction path
Ameren Transmission (ATXI), GridLiance Heartland and Dairyland Power765 kV and 500 kV AC linesIA, MN187 mi, 765 kVApproved, not yet built–June 2034Nov 18, 2026
Woodford County to Illinois-Indiana State Line 765 kV (WIIL)
Two new 765 kV lines and a new substation
Ameren Transmission (ATXI), GridLiance Heartland, Dairyland Power and IMEA765 kV and 500 kV AC linesIL, IN88 mi, 765 kVApproved, not yet built$718M2034Nov 18, 2026
Entergy Louisiana seven more gas plants for Meta Hyperion
Richland and Pointe Coupee parishes; needs Louisiana PSC approval
Entergy LouisianaLarge new power plantsLA5,200 MWPlanning and permitting$12.9B–Aug 7, 2026
SOO Green HVDC Link
Iowa to the Chicago area
SOO Green Renewable RailLong-distance HVDC linesIA, IL350 mi, HVDC, mostly underground along rail linesPlanning and permitting––Sep 15, 2026
North Plains Connector
Montana to North Dakota; federal environmental review done Aug 2026
Grid United and ALLETELong-distance HVDC linesMT, NDHVDCPlanning and permitting––Sep 15, 2026
Southern Spirit
Would link the Texas (ERCOT) grid with the Southeast
Pattern EnergyLong-distance HVDC linesTX, LA, MSHVDCPlanning and permitting––Sep 15, 2026
Greenlink North
Ely to Yerington
NV Energy765 kV and 500 kV AC linesNV235 mi, 525 kVPlanning and permitting–Dec 2028May 7, 2025
ERCOT 765 kV Eastern Backbone
Endorsed by ERCOT stakeholders; still needs Texas PUC approval
AEP, CenterPoint Energy, CPS Energy and Oncor765 kV and 500 kV AC linesTX1,109 mi, 765 kVPlanning and permitting$9.4B–Mar 5, 2026
Valley Link: Valley North 765 kV
Putnam County, West Virginia to Frederick County, Maryland
Valley Link (Dominion, FirstEnergy, Transource)765 kV and 500 kV AC linesWV, MD260 mi, 765 kVPlanning and permitting––Feb 27, 2025
Valley Link: Joshua Falls to Yeat 765 kV
Campbell County to northern Virginia; route revised in 2026
Valley Link (Dominion, FirstEnergy, Transource)765 kV and 500 kV AC linesVA155 mi, 765 kVPlanning and permitting––Jul 17, 2026

Cost is the developer's or regulator's published estimate; – means no figure has been published. In-service dates are the developer's latest target and often move.

What the grid build-out means for hiring

The projects on this map add 6,112 miles of new high-voltage line, most of it 765 kV or HVDC, a scale the US has not built in a generation. Each one needs transmission line and substation design engineers, protection and controls engineers, power system planners, civil and structural engineers for towers and foundations, and project and construction engineers in the field. Many of these engineers are already in short supply, and data center demand is pulling on the same talent.

Texas stands out: the 765 kV lines approved for the Permian Basin and the planned Eastern Backbone will run through the Dallas-Fort Worth, Houston and San Antonio regions. Apollo Technical recruits electrical engineers and renewable energy engineers for utilities, developers and the firms that design and build these projects, with local teams in Houston, Austin and across Texas. For what these roles pay, try the engineering salary calculator.

Related trackers: the US data center map, the Data Center Workforce Report, the new factory construction map and the semiconductor plants map, all large new loads that these lines and plants are being built to serve.

How this map is built

The map covers major new transmission lines (long-distance HVDC and 765 kV or 500 kV AC) and the largest new power plants, checked against developer announcements, grid operator and regulator records and news reports in November 2026. Nuclear projects are not included. Lines are drawn straight between the end points the developer has named, to show which regions they join; most surveyed routes are still being decided. Cost and in-service dates are the developer’s or regulator’s latest published figures and change often. Know a major project we should add? Email info@apollotechnical.com.

Power grid projects FAQ

What is a 765 kV transmission line?

765 kilovolts is the highest voltage used on the US grid. One 765 kV line can carry about as much power as six 345 kV lines, with lower losses and a narrower total footprint, which is why Texas, the Southwest Power Pool, MISO and PJM are all planning 765 kV backbones. Texas approved its first 765 kV lines in 2025 and 2026.

What is an HVDC transmission line?

High-voltage direct current lines move large amounts of power over long distances with lower losses than AC lines, and link grids that are not synchronized. Converter stations at each end turn AC into DC and back. SunZia, the Champlain Hudson Power Express and the New England Clean Energy Connect all entered service in 2026.

What is the biggest transmission line being built in the US?

By capacity, Invenergy’s Grain Belt Express, an 800-mile, 5,000 MW HVDC line from Kansas to the Illinois-Indiana border, is the largest approved project, with its first phase starting construction. The largest line under construction is TransWest Express, 732 miles from Wyoming to Nevada.

What engineers do transmission and power plant projects need?

Transmission line and substation design engineers, protection and controls engineers, power system planning and interconnection engineers, civil, structural and geotechnical engineers, and project and construction engineers. Power plants add mechanical, electrical and instrumentation and controls engineers for commissioning and operations.

How often is the map updated?

Monthly. New approvals, construction starts, in-service dates and cancellations are added as they are reported, each with its source. This edition was checked in November 2026.