This map tracks large US data center projects, 100 MW and up, from first announcement through construction to opening. Each project shows the operator, location, planned capacity, status, investment and announced jobs, with a link to the press release, filing or news report the figures come from. We check every row against its source and update the tracker monthly.

Use the filters to narrow the map by state, status or size, or search for an operator such as Meta, Microsoft or Crusoe. Click any circle for the project details.

111active projects tracked
106.8 GWplanned capacity
52 GWunder construction
85,775+construction jobs announced
Under construction Announced Operational Paused or cancelled Circle size = planned MW. Pins are placed at the town or county named in the source, not the exact site.

ProjectOperatorLocationMWStatusInvestmentConstruction jobsPermanent jobsExpectedSource
PORTS Technology CampusSB EnergyPiketon, OH10,000Under construction–10,0002,000–Source (2026-03-24)
Hyperion (Richland Parish)MetaHolly Ridge, LA5,000Under construction$50B–1,000–Source (2026-07-13)
Caldwell Valley Technology ParkTractLockhart, TX4,000Announced–––2028Source (2026-01-13)
Project Camellia (Effingham County, Savannah Gateway Industrial Hub)OpenAISpringfield, GA3,200Announced$20B–4002032Source (2026-07-22)
Project Tembo (formerly Project Jade)GoogleCheyenne, WY2,700Announced$17B2,5002502031Source (2026-07-08)
Project Jupiter (Doña Ana County)OracleSanta Teresa, NM2,450Under construction–4,0001,5002028Source (2026-04-27)
Hanover Technology ParkTractAshland, VA2,400Announced––––Source (2024-05-08)
New Carlisle campus (Project Rainier, up to 30 buildings)Amazon Web ServicesNew Carlisle, IN2,200Operational––––Source (2025-10-29)
Project Tamarack (Mason County high-impact data center)Starwood Digital VenturesPoint Pleasant, WV2,160Announced$12B–––Source (2026-09-03)
Champion campus (former Southland Paper Mill)Amp ZLufkin, TX2,100Announced––––Source (2026-02-05)
Pecos datacenter campusMicrosoftPecos, TX2,000Announced–6,000––Source (2026-06-22)
Project HorizonPoolsideFort Stockton, TX2,000Paused––––Source (2026-04-02)
Project Phoenix (three facilities)Aligned Data CentersShippingport, PA2,000Under construction–3,000640–Source (2026-09-10)
Monarch Compute Campus (phase one)NscalePoint Pleasant, WV2,000Under construction$69.2B4,3756452028Source (2026-09-03)
Buckeye Technology ParkTractBuckeye, AZ1,800Announced––––Source (2024-08-28)
Joliet Technology CenterHillwood and PowerHouse Data CentersJoliet, IL1,800Announced$20B7,000700–Source (2026-02-13)
Paducah AI and HPC campus (former DOE enrichment site)BrookfieldPaducah, KY1,800Announced$100B8,0006002031Source (2026-07-29)
Helios campus (Dickens County)GalaxyDickens, TX1,630Under construction–––2027Source (2026-07-06)
Oklahoma 1.6 GW campusIRENAlva, OK1,600Announced––––Source (2026-02-05)
Cameron County AI campus (first phase)FluidstackBrownsville, TX1,500Under construction$4B2,500––Source (2026-09-21)
Frontier (Shackelford County, 10 data centers)Vantage Data CentersAlbany, TX1,400Under construction$25B––2026Source (2025-08-19)
Sweetwater 1IRENSweetwater, TX1,400Under construction–––2027Source (2026-09-08)
Pennsylvania Digital I / PAX (three Carlisle-area campuses)Pennsylvania Data Center Partners and PowerHouse Data CentersCarlisle, PA1,350Announced$15B–––Source (2025-07-15)
LC Campus (14 data centers, LC3 and LC4 under construction)CloudHQAshburn, VA1,256Under construction––––Source
Evanston campus (initial phase)Prometheus HyperscaleEvanston, WY1,250Announced––––Source (2026-06-17)
Falls RanchPrometheus HyperscaleCasper, WY1,250Announced––––Source (2026-06-17)
Project ArrowheadPremier Data Center DevelopmentMystic, GA1,250Announced$6B––2034Source (2026-04-14)
Stargate I / Lancium Clean Campus (Phases 1-2, 8 buildings)CrusoeAbilene, TX1,200Under construction–5,000–2026Source (2025-03-18)
Milam County StargateSB EnergyCameron, TX1,200Under construction––––Source (2026-01-09)
Central Texas campus (three 400 MW phases)CloudBurst Data CentersSan Marcos, TX1,200Under construction$14.5B––2027Source (2026-05-07)
West Creek campus (under consideration)GoogleGoochland, VA1,200Announced––––Source (2026-10-28)
Shannon Hill campus (Louisa County)EdgeCore Digital InfrastructureLouisa, VA1,100Announced$17B–––Source (2025-06-25)
Stafford Technology Campus (four sub-campuses, 19 data centers)STACK InfrastructureStafford, VA1,100Under construction–1,000––Source (2025-01-16)
El Paso Data CenterMetaEl Paso, TX1,000Under construction$14B4,0003002028Source (2026-07-28)
Beacon Point (Phases 1-2, Nueces County)Hut 8Corpus Christi, TX1,000Under construction$17B1,900230–Source (2026-07-20)
Childress AI data center campusCrusoeChildress, TX1,000Announced––––Source (2026-07-15)
Project Hercules (Appomattox)AVAIO Digital PartnersAppomattox, VA1,000Announced$3B–––Source (2024-12-10)
New Albany Data Center / PrometheusMetaNew Albany, OH1,000Under construction$1.5B1,200300–Source (2026-09)
Morris Technology ParkTractMorris, IL1,000Announced–1,0003502028-06Source (2026-01-15)
Lebanon data center campusMetaLebanon, IN1,000Under construction$10B4,000300–Source (2026-02-11)
Colossus and Colossus 2 (two Memphis sites, collective compute)xAIMemphis, TN1,000Operational––––Source (2026-06)
The Barn / StargateRelated DigitalSaline, MI1,000Under construction–2,500450–Source (2026-06-01)
ColchisCipher DigitalSan Angelo, TX1,000Announced–––2028Source (2025-11-03)
Texas Critical Data Centers (TCDC)New Era Energy & DigitalOdessa, TX1,000Announced––––Source (2026-04-01)
Taylor Technology CampusBig Watt Digital and PowerHouse Data CentersTaylor, TX1,000Announced–––2028Source (2026-10-09)
Muskie Data Campus (eastern Kentucky)TeraWulfUndisclosed site, KY1,000Announced–––2029Source (2026-10-05)
Van Buren Township data centerGoogleVan Buren Township, MI1,000Announced–––2027-12Source (2026-10-19)
Cumulus data center campusAmazon Web ServicesSalem Township, PA960Under construction––1,000–Source (2024-08-26)
Lighthouse / Stargate (four data centers, Port Washington)Vantage Data CentersPort Washington, WI902Under construction$15B4,0001,0002028Source (2025-10-22)
Abilene AI factory for Microsoft (adjacent campus, two buildings)CrusoeAbilene, TX900Under construction–––2027Source (2026-03-27)
Claude campus (Armstrong County, for Google)CrusoeClaude, TX900Under construction––––Source (2026-09-15)
Apollo (site option, near San Antonio)Cipher DigitalSan Antonio, TX900Announced––––Source (2026-08-04)
Mountain Road Technology Park (Hanover County)TractHanover, VA900Cancelled––––Source (2026-06-02)
PowerHouse 95 (Cosner's Corner)PowerHouse Data CentersFredericksburg, VA900Under construction–––2027Source (2026-02-05)
Kingsboro campusEnergy Storage SolutionsTarboro, NC900Cancelled$19.2B–––Source (2026-07-15)
Project Sail (nine buildings)PrologisNewnan, GA900Announced––––Source (2026-04-10)
Bolingbroke Technology CampusUndisclosed developerBolingbroke, GA900Cancelled$5.8B–––Source (2025-04-10)
Vance County campus (12 buildings)Natelli HoldingsHenderson, NC900Announced––––Source (2026-09-11)
Johnstown campus (eight data centers)CologixJohnstown, OH800Under construction$7B–––Source (2024-11-20)
Triangle Innovation Point West data centerEco TIP WestMoncure, NC750Announced––––Source (2026-09-18)
Holt Economic Opportunity ParkLighthouse SustainabilityHolt, MI700Announced$10B–––Source (2026-10-29)
Sweetwater 2IRENRoby, TX600Announced––––Source (2026-09-08)
Project RubyHabitat PartnersColumbus, GA600Announced$5B––2034Source (2026-03-03)
Project Caprock (six facilities)Aligned Data CentersAbernathy, TX540Under construction–––2027Source (2026-04-09)
Mesa campus (PH01 plus expansion)EdgeCore Digital InfrastructureMesa, AZ450Under construction––––Source (2025-05-20)
Fairwater Mount Pleasant (phase 1)MicrosoftMount Pleasant, WI450Operational$3.3B3,0005002026Source (2025-01-09)
Delta Forge 1Applied DigitalBoyce, LA430Under construction$3.6B1,0002002027Source (2026-04-23)
Cheyenne campus (CoreWeave)Related DigitalCheyenne, WY420Under construction$1.2B700–2026Source (2026-06-14)
Thad Hill data center (Bosque County, Phase 1-2 power)CyrusOneMeridian, TX400Under construction–––2026Source (2025-11-03)
Moores Chapel Road campus (two buildings)Digital RealtyCharlotte, NC400Under construction––––Source (2026-08-06)
Polaris Forge 1 (contracted full build)Applied DigitalEllendale, ND400Operational––––Source (2026-07-01)
Monrovia data centerGoogleMonrovia, IN390Announced––––Source (2026-04-23)
Freestone Energy Center data center (Phase 1)CyrusOneFairfield, TX380Under construction––––Source (2026-06-08)
Desert Haven campus (Hudspeth County)Kaufman & CompanySierra Blanca, TX350Under construction$15B–––Source (2026-10-09)
Midwest Digital GatewayCorscaleCanton, OH312Announced$2.9B3,0001502029Source (2026-09-24)
T5 ATL IVT5 Data CentersPalmetto, GA300Announced––––Source (2024-08-28)
Digital Drive (Meadowville, five buildings)Chirisa Technology ParksChesterfield, VA300Under construction–––2028Source (2024-09-26)
PowerHouse Charlotte (five buildings)PowerHouse Data CentersCharlotte, NC300Under construction––––Source (2025-01)
Barber LakeCipher DigitalColorado City, TX300Under construction–––2027-01Source (2025-11-20)
Temple campusRowan Digital InfrastructureTemple, TX300Under construction$700M––2027Source (2026-01-06)
Project CincoRowan Digital InfrastructureLytle, TX300Under construction$900M––2027Source (2025-08-08)
Dunn Road data centerEnergy Storage SolutionsFayetteville, NC300Cancelled––––Source (2026-05-21)
PHXA campus (seven buildings)Stream Data CentersGoodyear, AZ280Under construction––––Source (2026-01-06)
Polaris Forge 2Applied DigitalHarwood, ND280Under construction$3B–2002027Source (2025-08-18)
Denton HPC campus (CoreWeave expansion)Core ScientificDenton, TX260Operational––––Source (2025-02-26)
Fayetteville campus (includes Microsoft Fairwater)QTS Data CentersFayetteville, GA250Operational––––Source (2026-03-13)
Apex data centerNatelli InvestmentsApex, NC250Cancelled––––Source (2026-03-06)
River Bend (initial IT capacity)Hut 8St. Francisville, LA245Under construction$10B1,000752027Source (2025-12-17)
Rockdale campus (AI and HPC conversion)Riot PlatformsRockdale, TX241Operational–––2028-06Source (2026-08-10)
Richmond 3 (five buildings, Portugee Road)QTS Data CentersSandston, VA240Under construction––––Source (2025-03)
Atlanta West campusStream Data CentersDouglasville, GA240Announced––––Source (2024-11-28)
Cassia County campusTerraVolt HoldingsBurley, ID240Announced––––Source (2026-10-30)
Cumberland County data centerPRSM GroupFayetteville, NC225Announced–1,500––Source (2026-05-21)
Project Matador TensorWave facility (Carson County)Fermi AmericaPanhandle, TX222Announced–––2027Source (2026-08-10)
New Albany campusQTS Data CentersNew Albany, OH222Under construction$1.5B–––Source (2023-11-27)
Beaver Dam data centerMetaBeaver Dam, WI220Under construction$1B1,0001002027Source (2026-05-07)
Goodyear campusCompass DatacentersGoodyear, AZ212Under construction––––Source (2025-12-22)
Phoenix 2QTS Data CentersPhoenix, AZ210Under construction––––Source (2024-08-27)
Delta Forge 2 / Project HighlandsApplied DigitalBrookwood, AL210Announced$3.2B1,0001002028Source (2026-09-25)
ATL11-ATL13EdgeConneXUnion City, GA202Under construction––––Source (2024-09)
Project IndoDataBankCartersville, GA200Announced$2.4B––2032Source (2026-06-22)
NVA05STACK InfrastructureManassas, VA200Under construction––––Source (2025-01-14)
Hoffman Estates campus (five buildings, former Sears HQ)Compass DatacentersHoffman Estates, IL200Under construction$10B1,000––Source (2025-12-22)
Northern Pennsylvania campusAlpha ComputeUndisclosed site, PA200Announced–––2027Source (2026-08-11)
Atlanta West campus (three data centers)DC BLOXLithia Springs, GA200Operational––––Source (2026-10)
NC-1 campusWhiteFiberMadison, NC200Operational––––Source (2025-06-02)
NC-2 and NC-3 sitesWhiteFiberYadkinville, NC200Announced–––2027Source (2026-08-17)
Culpeper campusEdgeCore Digital InfrastructureCulpeper, VA196Announced–––2029Source (2026-10)
OH1 (three buildings)Vantage Data CentersNew Albany, OH192Under construction$2B––2028Source (2024-10-25)
AZ1 (five buildings)Vantage Data CentersGoodyear, AZ176Under construction––––Source (2024-11-25)
Abernathy HPC campus (Fluidstack joint venture)FluidstackAbernathy, TX168Under construction–––2026Source (2025-10-28)
Atlanta East campusDC BLOXConyers, GA154Under construction––––Source (2026-10)
Loudoun County campus (two 72 MW buildings)STACK InfrastructureAshburn, VA144Announced––––Source (2025-02-11)
Meadowville CTP-02 and CTP-03 (CoreWeave, new capacity)Chirisa Technology ParksChester, VA120Under construction–––2026Source (2025-05-29)
El Mirage campusCompass DatacentersEl Mirage, AZ108Under construction–––2027Source (2025-12-22)
Bells Ferry Road campusGrindcapMarietta, GA108Announced––––Source (2025-06-18)
Pennsylvania AI data center (initial 100 MW, expandable to 300 MW)CoreWeaveLancaster, PA100Announced$6B60070–Source (2025-07-15)
Anaconda Road campusEnergy Storage SolutionsTarboro, NC100Cancelled$6.4B–––Source (2025-09-09)

– means the source does not state a figure; we do not estimate. Capacity is the figure the developer or operator announced. Expected dates are often the first building or phase, not full build-out. Last updated November 2026.

Data center capacity by state

StateActive projectsPlanned MWUnder construction MW
Texas3130,39116,068
Ohio612,52612,214
Virginia1310,1564,116
Georgia127,604356
Louisiana35,6755,675
Wyoming45,620420
Pennsylvania54,6102,960
West Virginia24,1602,000
Indiana33,5901,000
Arizona73,2361,436
Illinois33,000200
North Carolina72,975700
Kentucky22,800–
Michigan32,7001,000
New Mexico12,4502,450
Oklahoma11,600–
Wisconsin31,5721,122
Tennessee11,000–
North Dakota2680280
Idaho1240–
Alabama1210–

State trackers: data centers in Texas, data centers in Georgia and data centers in North Carolina, each with its own map, project table, developers and counties.

Largest data center projects in the US

The 10 biggest active projects on the map, ranked by the capacity their developers have announced.

#ProjectDeveloperLocationPlanned MWStatus
1PORTS Technology CampusSB EnergyPiketon, OH10,000Under construction
2Hyperion (Richland Parish)MetaHolly Ridge, LA5,000Under construction
3Caldwell Valley Technology ParkTractLockhart, TX4,000Announced
4Project Camellia (Effingham County, Savannah Gateway Industrial Hub)OpenAISpringfield, GA3,200Announced
5Project Tembo (formerly Project Jade)GoogleCheyenne, WY2,700Announced
6Project Jupiter (Doña Ana County)OracleSanta Teresa, NM2,450Under construction
7Hanover Technology ParkTractAshland, VA2,400Announced
8New Carlisle campus (Project Rainier, up to 30 buildings)Amazon Web ServicesNew Carlisle, IN2,200Operational
9Project Tamarack (Mason County high-impact data center)Starwood Digital VenturesPoint Pleasant, WV2,160Announced
10Champion campus (former Southland Paper Mill)Amp ZLufkin, TX2,100Announced

Top data center developers

The companies with the most planned capacity across the active projects we track.

#Developer / operatorProjectsPlanned MWUnder construction MWStates
1SB Energy211,20011,200OH, TX
2Tract49,200–AZ, IL, TX, VA
3Meta58,2208,220IN, LA, OH, TX, WI
4Google45,290–IN, MI, VA, WY
5Crusoe44,0003,000TX
6IREN33,6001,400OK, TX
7OpenAI13,200–GA
8Amazon Web Services23,160960IN, PA
9Vantage Data Centers42,6702,670AZ, OH, TX, WI
10Aligned Data Centers22,5402,540PA, TX

How the pipeline is changing

The tracker counts 111 active projects with 106.8 GW of planned capacity, 52 GW of it under construction (updated November 2026). This section updates itself each time the tracker data changes.

Changes in the latest update

Since the October 2026 snapshot: 9 new projects and 1 came online.

  • Came onlinePolaris Forge 1 (contracted full build), Applied Digital, Ellendale, ND: under construction to operational, 400 MW (source)
  • NewCameron County AI campus (first phase), Fluidstack, Brownsville, TX: 1,500 MW, under construction (source)
  • NewWest Creek campus (under consideration), Google, Goochland, VA: 1,200 MW, announced (source)
  • NewTaylor Technology Campus, Big Watt Digital and PowerHouse Data Centers, Taylor, TX: 1,000 MW, announced (source)
  • NewMuskie Data Campus (eastern Kentucky), TeraWulf, KY: 1,000 MW, announced (source)
  • NewVan Buren Township data center, Google, Van Buren Township, MI: 1,000 MW, announced (source)
  • NewTriangle Innovation Point West data center, Eco TIP West, Moncure, NC: 750 MW, announced (source)
  • NewHolt Economic Opportunity Park, Lighthouse Sustainability, Holt, MI: 700 MW, announced (source)
  • NewDesert Haven campus (Hudspeth County), Kaufman & Company, Sierra Blanca, TX: 350 MW, under construction (source)
  • NewCassia County campus, TerraVolt Holdings, Burley, ID: 240 MW, announced (source)

Pipeline by month

406080100120Oct 2026Nov 2026
Planned capacity (GW)Under construction (GW)
MonthActive projectsPlanned GWUnder construction GW
November 2026111106.852
October 202610299.150.5

When the new capacity is due

Announced and under-construction projects, by the year the developer expects to open. The date is usually for the first building or phase, so later phases often run past it.

What the map shows right now

The jobs behind these projects

We turn this map into workforce numbers in our Data Center Workforce Report: how many construction workers and permanent staff these projects need, and which metros are most stretched.

Each campus on this map needs two different workforces. During construction, the demand is for electrical and mechanical engineers, project and construction managers, commissioning agents, controls engineers and skilled trades. Once buildings come online, the need shifts to critical facilities engineers, data center technicians and operations managers who keep power and cooling running around the clock.

Most of these projects are going up in towns with small local talent pools, so employers recruit nationally and compete for the same people. See the 12 most in-demand data center roles, the power and cooling skills AI data centers need and the latest data center workforce shortage statistics.

Staffing a data center project? Apollo Technical recruits engineers and technical professionals for data center construction and operations. Talk to our data center recruiting team, or read our guide on how to hire data center engineers.

How we build this tracker

Spot a project we’ve missed or a figure that’s changed? Let us know and we’ll check it for the next update.

Data center map FAQ

How many large data centers are being built in the US?

This tracker counts more than 110 active US data center projects of 100 MW or more. Together they add up to over 105 GW of planned capacity, and just under half is already under construction. The live totals are at the top of the map.

Which state has the most data center projects?

Texas has the most large projects on the map, followed by Virginia, Georgia, and then Arizona and North Carolina, which are tied. See the “Data center capacity by state” table above for the full ranking.

What does MW mean for a data center?

Data centers are measured by the electrical power they can draw, in megawatts (MW) or gigawatts (1 GW = 1,000 MW). A 1 GW campus uses about as much power as a mid-sized city. Developers sometimes quote total power and sometimes the IT load available to servers, so compare figures with care.

How many jobs does a data center create?

Large campuses typically announce thousands of construction jobs at peak and a few hundred permanent jobs once running. On this map, for example, Meta’s El Paso project lists 4,000 construction and 300 permanent jobs. Read more in our data center construction statistics.

How often is the map updated?

Monthly. Each update adds newly announced projects, changes status as projects break ground or come online, and marks projects that are paused or cancelled. The date of the last update is shown under the project table.