US Data Center Map / Georgia

Data Centers in Georgia: 2026 Map and Project Tracker

Every large data center project in Georgia, 100 MW and up, from metro Atlanta to Savannah and the rural south. Each figure is checked against its source and the tracker is updated monthly.

Hiring for a data center project?

Georgia has become one of the fastest-growing data center states in the US, led by metro Atlanta. Our tracker counts 12 active data center projects of 100 MW or more in Georgia, adding up to 7.6 GW of planned capacity. By number of large projects, Georgia ranks second among the states on our US data center map.

Below you’ll find a map of every project, a table with the operator, location, capacity, status, investment and announced jobs for each one, and the developers and counties with the most capacity. Click any circle on the map for project details.

12active projects of 100 MW+
7.6 GWplanned capacity
356 MWunder construction
$33.4B+announced investment
Under construction Announced Operational Paused or cancelled Circle size = planned MW. Pins mark the town or county named in the source, not the exact site.

Data center projects in Georgia

Every active campus of 100 MW or more in Georgia on our tracker, largest first.

ProjectOperatorLocationMWStatusInvestmentConstruction jobsPermanent jobsExpectedSource
Project Camellia (Effingham County, Savannah Gateway Industrial Hub) OpenAI Springfield (Effingham County) 3,200 Announced $20B – 400 2032 Source (2026-07-22)
Project Arrowhead Premier Data Center Development Mystic (Irwin County) 1,250 Announced $6B – – 2034 Source (2026-04-14)
Project Sail (nine buildings) Prologis Newnan (Coweta County) 900 Announced – – – – Source (2026-04-10)
Project Ruby Habitat Partners Columbus (Muscogee County) 600 Announced $5B – – 2034 Source (2026-03-03)
T5 ATL IV T5 Data Centers Palmetto (Fulton County) 300 Announced – – – – Source (2024-08-28)
Fayetteville campus (includes Microsoft Fairwater) QTS Data Centers Fayetteville (Fayette County) 250 Operational – – – – Source (2026-03-13)
Atlanta West campus Stream Data Centers Douglasville (Douglas County) 240 Announced – – – – Source (2024-11-28)
ATL11-ATL13 EdgeConneX Union City (Fulton County) 202 Under construction – – – – Source (2024-09)
Project Indo DataBank Cartersville (Bartow County) 200 Announced $2.4B – – 2032 Source (2026-06-22)
Atlanta West campus (three data centers) DC BLOX Lithia Springs (Douglas County) 200 Operational – – – – Source (2026-10)
Atlanta East campus DC BLOX Conyers (Rockdale County) 154 Under construction – – – – Source (2026-10)
Bells Ferry Road campus Grindcap Marietta (Cobb County) 108 Announced – – – – Source (2025-06-18)

– means the source does not state a figure; we do not estimate. Capacity is the figure the developer or operator announced. Expected dates are often the first building or phase. Last updated October 2026. See Georgia on the full US map.

Paused or cancelled projects

ProjectOperatorLocationMWStatusSource
Bolingbroke Technology CampusUndisclosed developerBolingbroke (Monroe County)900CancelledSource (2025-04-10)

Top data center developers in Georgia

DeveloperProjectsPlanned MW
OpenAI13,200
Premier Data Center Development11,250
Prologis1900
Habitat Partners1600
DC BLOX2354
T5 Data Centers1300
QTS Data Centers1250
Stream Data Centers1240
EdgeConneX1202
DataBank1200

Data center capacity by county

CountyTownsPlanned MW
EffinghamSpringfield3,200
IrwinMystic1,250
CowetaNewnan900
MuscogeeColumbus600
FultonPalmetto, Union City502
DouglasDouglasville, Lithia Springs440
FayetteFayetteville250
BartowCartersville200
RockdaleConyers154
CobbMarietta108

Data centers in Atlanta: how big is the market?

Atlanta is now the second-largest data center market in the US, behind only Northern Virginia. According to CBRE, Atlanta ended 2025 with 1,459 MW of data center inventory, up 459 MW in a year, with vacancy at just 2% and 2,076 MW under construction.

2026 has been even busier:

Where data centers are being built in Georgia

The first wave of Georgia data centers clustered west and south of Atlanta, in Douglas, Fulton, Fayette and Coweta counties, close to fiber routes and Georgia Power transmission lines. As metro sites fill up and local resistance grows, developers are moving further out.

Meta, Google, Microsoft and Amazon data centers in Georgia

Most of the household-name tech companies already run data centers in Georgia, and most are building more. They often don’t publish capacity figures, so several of these sites are not in the MW totals above.

Meta data center in Georgia (Stanton Springs)

Google data centers in Georgia

Microsoft data centers in Georgia

Amazon (AWS) data centers in Georgia

QTS, Switch and OpenAI

Power, Georgia Power and the PSC

Almost every large Georgia data center depends on Georgia Power, and the state Public Service Commission has changed the rules to protect other customers from the cost of serving them. In January 2025 the PSC approved new terms for customers of 100 MW or more, including minimum bills, longer contracts and paying for transmission and distribution costs as construction goes ahead.

In December 2025 the PSC approved just under 10 GW of new Georgia Power generation, most of it driven by data center demand. Georgia Power’s pipeline of potential large-load customers is far larger than what gets built, though. PSC staff said in 2025 that 33 data center projects totaling more than 11 GW had dropped out since 2023.

Georgia data center tax incentives

Georgia exempts qualifying high-technology data centers from sales and use tax on their equipment. Under current law, the exemption is set to expire on December 31, 2031.

It has survived several attempts to cut it back. Gov. Brian Kemp vetoed a 2024 bill that would have paused it, and a 2026 repeal bill passed the state Senate but was not taken up by the House. A state audit found the exemption cost $474 million in the fiscal year ending July 2025, and credited data centers with 8,505 construction jobs and 1,641 operations jobs.

Local pushback and moratoriums

Resistance to new data centers is strongest in the metro counties that have hosted the most of them. Douglas and Coweta counties both adopted temporary moratoriums in 2025, and DeKalb County extended its moratorium through September 2026. Monroe County commissioners rejected the proposed Bolingbroke campus in 2025, and Coweta approved Project Sail only by a 3-2 vote. Expect zoning hearings to remain the main hurdle for new Georgia projects.

Data center jobs in Georgia

With almost 3 GW under construction in metro Atlanta alone, Georgia data center builders are competing hard for electrical and mechanical engineers, project managers, commissioning agents and electricians. Once the campuses open, they need critical facilities engineers, data center technicians and network engineers, often in counties with small local talent pools. Site work adds demand for civil engineers in grading, stormwater and utilities. For pay by role, employers and hiring advice, see our Atlanta data center engineer talent map, plus our Atlanta electrical, mechanical and civil engineer talent maps.

See the 12 most in-demand data center roles, the power and cooling skills AI data centers need and our data center workforce shortage statistics.

Staffing a Georgia data center project? Apollo Technical recruits engineers and technical professionals for data center construction and operations. See our Atlanta engineering recruiting and Atlanta IT recruiting pages, talk to our data center recruiting team, or read our guide on how to hire data center engineers.

How we track Georgia data centers

Spotted a Georgia project we’re missing, or a figure that has changed? Let us know and we’ll check it for the next update.

Georgia data centers FAQ

How many data centers are being built in Georgia?

Our tracker counts 12 active Georgia data center projects of 100 MW or more. CBRE reported 2,882 MW of data center capacity under construction in metro Atlanta in mid-2026, more than any other market in North America.

What is the largest data center in Georgia?

The largest planned project on our tracker is OpenAI’s Project Camellia in Effingham County, planned at 3.2 GW with $20 billion of investment. The largest operating campus on the list is QTS’s Fayetteville campus, home to Microsoft’s Fairwater AI data center.

Where are AI data centers in Georgia?

Microsoft’s Fairwater site in Fayetteville is the best-known AI data center in Georgia. New AI-focused campuses are planned in Effingham County near Savannah, Coweta County, Columbia County near Augusta, and south Georgia.

Why is Atlanta a major data center market?

Atlanta has major fiber routes, a large regional power utility that has committed to building new generation, available land on the south and west sides of the metro, and a state sales tax exemption for data center equipment that runs through 2031.

Is Georgia stopping new data centers?

No statewide pause is in place. Several counties, including DeKalb, have used temporary moratoriums. Most of the fight happens at county zoning hearings.

Does Meta have a data center in Georgia?

Yes. Meta’s Georgia data center is at Stanton Springs in Newton County, east of Atlanta. Meta broke ground in 2018 and says it has invested more than $2 billion in its Georgia data centers.

Where is Google’s data center in Georgia?

Google’s main Georgia data center is in Lithia Springs, Douglas County, and has operated since 2007. Google has also announced data centers in LaGrange and Columbia County.

For the national picture, see our US data center map, data center statistics and top US data center markets by city. Other state trackers: Texas and North Carolina.