CAREER & HIRING ADVICE
Share it
Facebook
Twitter
LinkedIn
Email

New Oil Refineries in the US: Projects, Restarts and Closures (2026)

Oil refinery lit up at night across the water

Almost no new oil refineries are built in the US. The newest is Texas International Terminals’ 45,000 barrel-per-day plant in Galveston, which started in February 2022, and the last large refinery built from scratch was Marathon’s Garyville, Louisiana, in 1977 (EIA). Here are the new refinery projects, restarts and expansions to watch, and the closures that have outpaced them.

Key takeaways

  • America First Refining announced plans in March 2026 for a new refinery at the Port of Brownsville, Texas, designed to process about 60 million barrels a year of US light shale oil (company release).
  • Three refineries with about 400,000 barrels per day closed between 2025 and early 2026 (EIA).
  • Existing refineries keep growing: US capacity is only slightly below its 2020 record even though there are fewer refineries.
  • Nevada’s only crude refinery restarted in September 2026.

New US refinery projects

ProjectLocationSizeStatus
America First RefiningPort of Brownsville, TexasAbout 60 million barrels a year of light shale oilAnnounced March 2026 with a 20-year offtake agreement; groundbreaking targeted for Q2 2026
Meridian Davis RefineryNear Belfield, North Dakota49,500 barrels per day (proposed)Permitted years ago; no construction as of December 2025
Eagle Springs restart (Sky Quarry)Near Ely, NevadaAbout 5,000 barrels per dayRestarted September 2026
Chevron Pasadena expansionPasadena, TexasLight crude capacity raised to 125,000 barrels per dayCompleted, with startup through early 2025

Recent refinery closures

RefineryCapacity (barrels per day)Closed
Philadelphia Energy Solutions, Pennsylvania335,0002019-2020
Shell Convent, Louisiana211,1462020
Marathon Martinez, California (converted to renewable fuels)161,0002020
Phillips 66 Alliance, Louisiana255,6002021
LyondellBasell Houston, Texas263,776March 2025
Phillips 66 Los Angeles, California138,700October 2025
Valero Benicia, California145,000Early 2026
Sources: EIA (2020 closures), EIA (2021) and EIA (2025-2026).

Why the US rarely builds new refineries

  • Cost and time: a large refinery takes many years and billions of dollars to permit and build, and pays back over decades.
  • Demand uncertainty: refiners weigh long-term gasoline demand against electric vehicles and efficiency.
  • Permitting: air permits and local opposition can delay projects for years, as the Davis refinery in North Dakota shows.
  • Expansion is cheaper: adding capacity at existing refineries, as ExxonMobil did at Beaumont, costs far less than a new site.

What it means for jobs

Closures cut jobs where they happen, but the remaining refineries are running harder and expanding, which keeps demand high for process, reliability and inspection engineers on the Gulf Coast. See the main oil refinery jobs, or every operating refinery on our US oil refineries map.

Hiring for a refinery project? Apollo Technical recruits process, chemical, mechanical, electrical and controls engineers for refining and petrochemical projects. See our Houston engineering recruiters.

Share it
Facebook
Twitter
LinkedIn
Email

Categories

Related Posts

YOUR NEXT ENGINEERING OR IT JOB SEARCH STARTS HERE.

Don't miss out on your next career move. Work with Apollo Technical and we'll keep you in the loop about the best IT and engineering jobs out there — and we'll keep it between us.

HOW DO YOU HIRE FOR ENGINEERING AND IT?

Engineering and IT recruiting are competitive. It's easy to miss out on top talent to get crucial projects done. Work with Apollo Technical and we'll bring the best IT and Engineering talent right to you.