US Data Center Map / Texas

Data Centers in Texas: 2026 Map and Project Tracker

Every large data center project in Texas, 100 MW and up, from the Panhandle to the I-35 corridor. Each figure is checked against its source and the tracker is updated monthly.

Hiring for a data center project?

Texas is the biggest data center state in the country right now. Our tracker counts 28 active data center projects of 100 MW or more in Texas, adding up to 27.5 GW of planned capacity, with 14.2 GW already under construction. That is more large projects than any other state on our US data center map.

Below you’ll find a map of every project, a table with the operator, location, capacity, status, investment and announced jobs for each one, and the developers and counties with the most capacity. Click any circle on the map for project details.

28active projects of 100 MW+
27.5 GWplanned capacity
14.2 GWunder construction
$72.1B+announced investment
Under construction Announced Operational Paused or cancelled Circle size = planned MW. Pins mark the town or county named in the source, not the exact site.

Data center projects in Texas

Every active campus of 100 MW or more in Texas on our tracker, largest first.

ProjectOperatorLocationMWStatusInvestmentConstruction jobsPermanent jobsExpectedSource
Caldwell Valley Technology Park Tract Lockhart (Caldwell County) 4,000 Announced – – – 2028 Source (2026-01-13)
Champion campus (former Southland Paper Mill) Amp Z Lufkin (Angelina County) 2,100 Announced – – – – Source (2026-02-05)
Pecos datacenter campus Microsoft Pecos (Reeves County) 2,000 Announced – 6,000 – – Source (2026-06-22)
Helios campus (Dickens County) Galaxy Dickens (Dickens County) 1,630 Under construction – – – 2027 Source (2026-07-06)
Frontier (Shackelford County, 10 data centers) Vantage Data Centers Albany (Shackelford County) 1,400 Under construction $25B – – 2026 Source (2025-08-19)
Sweetwater 1 IREN Sweetwater (Nolan County) 1,400 Under construction – – – 2027 Source (2026-09-08)
Stargate I / Lancium Clean Campus (Phases 1-2, 8 buildings) Crusoe Abilene (Taylor County) 1,200 Under construction – 5,000 – 2026 Source (2025-03-18)
Milam County Stargate SB Energy Cameron (Milam County) 1,200 Under construction – – – – Source (2026-01-09)
Central Texas campus (three 400 MW phases) CloudBurst Data Centers San Marcos (Hays County) 1,200 Under construction $14.5B – – 2027 Source (2026-05-07)
El Paso Data Center Meta El Paso (El Paso County) 1,000 Under construction $14B 4,000 300 2028 Source (2026-07-28)
Beacon Point (Phases 1-2, Nueces County) Hut 8 Corpus Christi (Nueces County) 1,000 Under construction $17B 1,900 230 – Source (2026-07-20)
Childress AI data center campus Crusoe Childress (Childress County) 1,000 Announced – – – – Source (2026-07-15)
Colchis Cipher Digital San Angelo (Tom Green County) 1,000 Announced – – – 2028 Source (2025-11-03)
Texas Critical Data Centers (TCDC) New Era Energy & Digital Odessa (Ector County) 1,000 Announced – – – – Source (2026-04-01)
Abilene AI factory for Microsoft (adjacent campus, two buildings) Crusoe Abilene (Taylor County) 900 Under construction – – – 2027 Source (2026-03-27)
Claude campus (Armstrong County, for Google) Crusoe Claude (Armstrong County) 900 Under construction – – – – Source (2026-09-15)
Apollo (site option, near San Antonio) Cipher Digital San Antonio 900 Announced – – – – Source (2026-08-04)
Sweetwater 2 IREN Roby (Fisher County) 600 Announced – – – – Source (2026-09-08)
Project Caprock (six facilities) Aligned Data Centers Abernathy (Hale County) 540 Under construction – – – 2027 Source (2026-04-09)
Thad Hill data center (Bosque County, Phase 1-2 power) CyrusOne Meridian (Bosque County) 400 Under construction – – – 2026 Source (2025-11-03)
Freestone Energy Center data center (Phase 1) CyrusOne Fairfield (Freestone County) 380 Under construction – – – – Source (2026-06-08)
Barber Lake Cipher Digital Colorado City (Mitchell County) 300 Under construction – – – 2027-01 Source (2025-11-20)
Temple campus Rowan Digital Infrastructure Temple (Bell County) 300 Under construction $700M – – 2027 Source (2026-01-06)
Project Cinco Rowan Digital Infrastructure Lytle (Medina County) 300 Under construction $900M – – 2027 Source (2025-08-08)
Denton HPC campus (CoreWeave expansion) Core Scientific Denton (Denton County) 260 Operational – – – – Source (2025-02-26)
Rockdale campus (AI and HPC conversion) Riot Platforms Rockdale (Milam County) 241 Operational – – – 2028-06 Source (2026-08-10)
Project Matador TensorWave facility (Carson County) Fermi America Panhandle (Carson County) 222 Announced – – – 2027 Source (2026-08-10)
Abernathy HPC campus (Fluidstack joint venture) Fluidstack Abernathy (Hale County) 168 Under construction – – – 2026 Source (2025-10-28)

– means the source does not state a figure; we do not estimate. Capacity is the figure the developer or operator announced. Expected dates are often the first building or phase. Last updated October 2026. See Texas on the full US map.

Paused or cancelled projects

ProjectOperatorLocationMWStatusSource
Project HorizonPoolsideFort Stockton (Pecos County)2,000PausedSource (2026-04-02)

Top data center developers in Texas

DeveloperProjectsPlanned MW
Tract14,000
Crusoe44,000
Cipher Digital32,200
Amp Z12,100
Microsoft12,000
IREN22,000
Galaxy11,630
Vantage Data Centers11,400
SB Energy11,200
CloudBurst Data Centers11,200

Data center capacity by county

CountyTownsPlanned MW
CaldwellLockhart4,000
AngelinaLufkin2,100
TaylorAbilene2,100
ReevesPecos2,000
DickensDickens1,630
MilamCameron, Rockdale1,441
ShackelfordAlbany1,400
NolanSweetwater1,400
HaysSan Marcos1,200
El PasoEl Paso1,000
NuecesCorpus Christi1,000
ChildressChildress1,000

How many data centers are in Texas?

It depends on what you count. Texas has hundreds of data center buildings, from small enterprise server rooms to hyperscale campuses, and there is no official state register of them. What can be counted is the large new campuses: our tracker lists 28 active Texas projects of 100 MW or more, 14 of them planned at 1 GW or more.

The market research firms measure it a different way. In its mid-2026 report, JLL put Texas at 26 GW of existing and under-construction data center capacity, the most of any state. JLL’s year-end 2025 outlook said Texas is on track to overtake Northern Virginia as the world’s largest data center market by 2030.

Where data centers are being built in Texas

Texas data center construction is happening in five broad areas. The older metro markets are still growing, but most of the gigawatt campuses are going up in rural West Texas and the Panhandle, where land is cheap and wind, solar and gas generation are close by.

Meta, Google, Microsoft and Amazon data centers in Texas

The biggest tech companies lease many of the Texas campuses on this page, and several are also building on their own land. Here is where each one stands.

Meta data centers in Texas

Google data centers in Texas

Microsoft data centers in Texas

Amazon (AWS) data centers in Texas

OpenAI and Oracle (Stargate)

The first Stargate campus, built by Crusoe in Abilene for Oracle and used by OpenAI, brought its first two buildings online in September 2025 and is planned at 1.2 GW across eight buildings. OpenAI has named two more Texas Stargate sites, in Shackelford County and Milam County.

QTS, CyrusOne and Digital Realty

The big colocation providers are expanding too. QTS runs campuses in Irving, Fort Worth and San Antonio and plans a $10 billion campus in Hall County. CyrusOne has 11 Texas data centers built or underway, including new campuses beside power plants in Freestone and Bosque counties. Digital Realty operates 12 data centers in the Dallas area.

Power, water and the 2026 permitting pause

Power is the limit on every Texas data center. Most of the state runs on the ERCOT grid, and data centers now dominate requests to connect to it. In August 2026, ERCOT was tracking more than 1,800 projects asking for over 474 GW, more than five times the grid’s record peak demand, and about 90% of the new requests were data centers.

Texas has tightened the rules in response:

Water and local control are the other pressure points. Texas counties have no zoning authority, so rural counties have few tools to slow projects. Hill County passed the state’s first county data center moratorium in May 2026, then rescinded it after a developer sued.

For anyone planning a project, this means timelines for new Texas campuses are less certain than they were a year ago. Projects already under construction are moving ahead, and the map above shows their status as of the last update.

Texas data center tax incentives

Since 2013, Texas has exempted qualifying data centers from the 6.25% state sales tax on servers, cooling, generators, software and electricity. To qualify, a data center must invest at least $200 million, occupy at least 100,000 square feet and create 20 permanent jobs. The cost of the exemption has grown from about $14.6 million in the 2014-15 budget to a projected $3.3 billion for 2028-29.

The exemption is still law, but it may not last. Abbott has said he will work with the Legislature in its next session to eliminate financial incentives for data centers.

Data center jobs in Texas

Each campus on this page needs two workforces. During construction, the demand is for electrical and mechanical engineers, project managers, commissioning agents, controls specialists and thousands of skilled trades. Electrical work alone is close to half of a data center construction budget, and Texas has about 71,000 electricians to share across every project in the state. Google is funding training for more than 1,700 electrical apprentices in Texas by 2030 to help close the gap.

Once a campus opens, the jobs shift to critical facilities engineers, data center technicians, network engineers and security staff. Many Texas sites are in towns of a few thousand people, so operators recruit from Dallas, Houston, Austin and San Antonio and across the country. See the 12 most in-demand data center roles, the power and cooling skills AI data centers need and our data center workforce shortage statistics.

Staffing a Texas data center project? Apollo Technical recruits engineers and technical professionals for data center construction and operations, with recruiting in Dallas, Houston, Austin and San Antonio. Talk to our data center recruiting team, or read our guide on how to hire data center engineers.

How we track Texas data centers

Spotted a Texas project we’re missing, or a figure that has changed? Let us know and we’ll check it for the next update.

Texas data centers FAQ

How many data centers are being built in Texas?

Our tracker counts 28 active Texas data center projects of 100 MW or more, with 14.2 GW of capacity under construction. Smaller projects are not included, so the total number of data center buildings going up in Texas is higher.

What is the largest data center in Texas?

By announced capacity, the largest active project on our tracker is listed first in the project table above. Several Texas campuses are planned at 1 GW or more, including Tract’s Caldwell Valley Technology Park near Lockhart, Amp Z’s Lufkin campus, Microsoft’s Pecos campus and Galaxy’s Helios campus in Dickens County.

Where are AI data centers in Texas?

Most of the new AI campuses are outside the big metros: Abilene, Sweetwater and Shackelford County in West Texas, Claude, Childress and Dickens County in the Panhandle, Pecos, and Milam County. In the metros, AI capacity is going up around Dallas-Fort Worth and along I-35 between Austin and San Antonio.

Who is building data centers in Texas?

The biggest developers on our tracker include Crusoe, Tract, Vantage Data Centers, IREN, Microsoft, Meta, Galaxy, SB Energy, Cipher Digital and Hut 8. Google, Microsoft, Meta, OpenAI and Oracle are among the companies that will use the capacity. The developers table above ranks them by planned MW.

Has Texas paused new data centers?

Not all of them. In September 2026, Gov. Abbott ordered the TCEQ to halt permits sought by data centers until the ERCOT and Texas Water Development Board audits are finished. Projects already under construction are continuing. We update project statuses on this page every month.

Why are so many data centers being built in Texas?

Texas offers large sites, a fast-growing power supply including wind, solar and gas, a sales tax exemption for qualifying data centers, and fewer local land-use controls in unincorporated areas than most states. Its independent ERCOT grid has also let developers connect large loads faster than in many other regions, although that is now under review.

Does Google have data centers in Texas?

Yes. Google runs data centers in Midlothian and Red Oak, south of Dallas, and is building new campuses in Armstrong, Haskell, Wilbarger, Gray and Roberts counties as part of a $40 billion investment through 2027.

Does Meta have data centers in Texas?

Yes. Meta operates data centers in Fort Worth and Temple and is building a 1 GW campus in El Paso, expected to open in 2028.

For the national picture, see our US data center map, data center statistics and top US data center markets by city. Other state trackers: Georgia and North Carolina.