A request for proposal (RFP) for recruiting services is a document you send to staffing and recruiting firms so they can bid on your hiring work in the same format. Below is a copy-ready RFP template built for engineering and technical hiring, the questions to ask every firm, a pricing form so quotes can be compared side by side, and a scoring sheet for picking the winner.
Key takeaways
- Describe the real roles, locations and volume. Vague RFPs get vague, padded answers.
- Ask every firm to price the same sample roles, so the quotes compare like for like.
- Score on recent proof in your discipline and market, not on the size of the firm or the polish of the deck.
- Read the guarantee, conversion and payment terms line by line. They matter as much as the fee percentage.
- Keep it to three to five firms. More than that and the good firms decide your RFP is not worth answering.
When to use an RFP for recruiting services
An RFP is worth the effort when you are choosing a preferred supplier for a year or more, staffing a large project, setting up contract labor for a plant or campus, or replacing a vendor that is not performing. For a single hard-to-fill role, an RFP is too slow. Call two specialist firms instead. Not sure which model you need? Start with our guide to in-house vs. agency vs. RPO.
The recruiting services RFP template
Copy this into a document and replace everything in [brackets]. Delete sections that do not apply, for example the contract staffing questions if you only need direct hires.
REQUEST FOR PROPOSAL: [ENGINEERING] RECRUITING AND STAFFING SERVICES
[Company name] | Issued: [date] | Responses due: [date, time, time zone]
1. About us
[Company name] is a [type of company] with [number] employees in [locations]. We [what you make, build or do]. Our engineering team has [number] people across [disciplines].
2. Purpose of this RFP
We are looking for [one / up to [X]] recruiting partners to help us hire [engineering and technical] staff over the next [12] months, starting [date]. This RFP explains what we need and how we will choose.
3. Scope of work
• Roles: [e.g. mechanical engineers, electrical engineers, controls engineers, CAD designers, project engineers]
• Levels: [entry to senior / leads / managers]
• Locations: [cities and sites], [on-site / hybrid / remote]
• Expected volume: about [number] hires over [12] months, with [peak months or project dates]
• Engagement types: [direct hire / contract / contract-to-hire]
• Licensing or clearance needs: [PE in (states) / EIT / security clearance / none]
• Out of scope: [executive search / hourly production roles / international hiring]
4. Timeline
• RFP issued: [date]
• Questions due: [date]. Send to [name, email]
• Answers to questions shared with all firms: [date]
• Proposals due: [date]
• Finalist calls: [dates]
• Decision: [date]
• Start of work: [date]
5. Questions for your firm
A. Experience
1. How long has your firm recruited [engineering] talent, and which disciplines make up most of your placements?
2. How many placements did you make in the last 12 months in the roles listed in Section 3? How many in [our metro area or state]?
3. Describe two recent searches like ours: the role, how long it took, and the outcome. (You do not need to name the client.)
B. Team and process
4. Who would work on our account? Give each person’s role and years of recruiting experience.
5. How do you find candidates who are not actively looking for a job?
6. How do you screen candidates before we see them? Do you check technical skills, licenses and references?
7. How quickly will we see the first qualified candidates after a job is opened?
8. How will you report progress, and how often?
C. Contract staffing (if in scope)
9. Are your contractors on your W2? What benefits do you offer them?
10. How do you handle timesheets, overtime, per diem and travel?
11. What are your conversion terms if we hire a contractor directly?
12. Confirm your general liability, professional liability and workers’ compensation insurance limits.
D. Terms
13. What guarantee do you offer on direct hire placements? Is it a free replacement or a refund, and is it prorated?
14. What are your payment terms?
15. Will you agree not to recruit our employees while we work together and for [12] months after?
16. Are there any minimums, exclusivity terms or setup fees?
E. Compliance
17. How do you handle I-9 and E-Verify for contractors, and background and drug checks?
18. How do you protect candidate and company data?
19. Describe your approach to building diverse candidate slates.
6. Pricing
Complete the pricing form in Appendix A for each sample role. All fees must be stated in full. Fees not listed in your proposal will not be paid.
7. How we will choose
We will score proposals on: relevant experience ([30]%), candidate quality and screening process ([25]%), speed and capacity ([15]%), price and terms ([20]%) and account team and reporting ([10]%). We may hold calls with finalists and ask for a short trial on one open role.
8. How to respond
Send your proposal as one PDF of no more than [10] pages, plus the completed pricing form, to [name, email] by [date and time]. Please answer the questions in Section 5 in order and use the same numbers.
9. Terms of this RFP
This RFP is not an offer to contract. [Company name] may change or cancel this RFP, choose more than one firm or none, and is not responsible for any cost of preparing a response. Information in this RFP is confidential and is shared only for the purpose of responding.
Contact
[Name], [Title]
[Email] | [Phone]
Appendix A: Pricing form
Give every firm the same three to five sample roles with a real pay range. That is the only way to compare bill rates and fees fairly.
| Sample role | Location | Pay range (we provide) | Direct hire fee (% of base) | Contract bill rate ($/hr) | Overtime bill rate | Conversion fee or terms |
|---|---|---|---|---|---|---|
| [Mechanical Engineer II] | [City] | [$90k–$115k] | ||||
| [Senior Electrical Engineer, PE] | [City] | [$130k–$160k] | ||||
| [Controls Engineer] | [City] | [$95k–$125k] | ||||
| [CAD Designer] | [City] | [$30–$40/hr] |
To set realistic pay ranges for the sample roles, use our engineering salary calculator. To check whether a contract bill rate beats hiring, use our contractor vs. employee cost calculator.
Scoring sheet for recruiting proposals
Have two or three people score each proposal on their own, 1 to 5 for each area, then multiply by the weight and add up.
| Area | Weight | What a 5 looks like | Firm A | Firm B | Firm C |
|---|---|---|---|---|---|
| Relevant experience | 30% | Many recent placements in your exact disciplines and market, with specific examples | |||
| Candidate quality and screening | 25% | Technical screening, license checks and reference checks before you see anyone | |||
| Speed and capacity | 15% | Realistic first-candidate times and enough recruiters for your volume | |||
| Price and terms | 20% | Clear fees, a fair guarantee, reasonable conversion terms, no hidden costs | |||
| Account team and reporting | 10% | A named lead who knows your field and a simple weekly report | |||
| Weighted total | 100% |
Red flags in recruiting proposals
- No examples in your field. A firm that mostly places IT or office staff will struggle with a PE-licensed structural engineer.
- Promises that sound too good. “Candidates in 24 hours” for a niche role usually means resumes pulled from a job board, not screened people.
- Fees that move. Watch for fees calculated on total compensation instead of base salary, or extra charges for relocation, sign-on bonuses or background checks.
- A thin guarantee. No guarantee at all, or one that needs you to pay in full before it applies.
- No one named. If the proposal does not say who will work on your roles, the work will likely go to whoever is free that week.
Once you have a partner, give them your scoring criteria up front. Our engineering interview scorecards make it easy to share exactly what a strong candidate looks like.
FAQ
What should a recruiting RFP include?
Company background, the roles, locations and hiring volume, the engagement types you need, a timeline, questions for each firm, a pricing form, how you will score proposals, and how and when to respond.
How many recruiting firms should get the RFP?
Three to five. Fewer than three gives you little to compare. More than five takes a long time to review, and strong firms are less likely to answer.
How long should firms get to respond?
Two to three weeks is normal, with a deadline for questions in the first week.
Should I choose the cheapest firm?
Not on price alone. A firm that fills a role a month sooner, or sends a hire who stays, is usually worth far more than a few points off the fee. That is why price is only one part of the scoring sheet.